Any time a building goes up, gets renovated, or has major systems replaced in Broward County, it passes through the same gatekeeper: the local Building Department. Whether you’re a homeowner adding a room, a contractor breaking ground on a new house, or an investor renovating a property before resale, understanding how Broward County’s permitting and inspection process works is essential — skipping it or getting it wrong can delay a project for months, trigger fines, or create problems when the property is eventually sold.
This guide covers how the Broward County Building Department fits into new construction, who actually issues your permit, what the process looks like from application to certificate of occupancy, and how it all eventually connects back to your property tax record.
Who Actually Handles Your Permit: County vs. City
One of the most common points of confusion in Broward County is that permitting isn’t handled by a single office. The Broward County Building Code Services Division, operating under the Department of Development Services, issues permits for the Broward Municipal Services District — essentially the unincorporated parts of the county. But Broward is home to over 30 incorporated cities, and most of them run their own building departments with their own staff, timelines, and local amendments to the Florida Building Code.
That means before you submit anything, the first real question is jurisdictional: is your project located in unincorporated Broward County, or inside a city like Fort Lauderdale, Hollywood, Pembroke Pines, Coral Springs, or Plantation? If it’s the latter, you’ll typically apply through that city’s building department rather than the county office, even though certain county-level reviews (like environmental or concurrency review) may still apply on top of the city process. Getting this wrong — submitting to the county when your parcel is actually inside a city’s limits — is a common and entirely avoidable delay.
What Requires a Permit
Broward County requires permits for a wide range of work, and the list is broader than most homeowners expect. New construction, additions, and structural renovations obviously require one, but so does much smaller-scale work:
- Electrical, plumbing, and mechanical (HVAC) installations or replacements
- Roofing work, including full replacements and major repairs
- Pools, spas, and screen enclosures
- Water heaters, air conditioning units, and permanent generators
- Low-voltage systems such as burglar alarms, fire alarm systems, and landscape lighting
- Demolition of any structure
Cosmetic work — painting, flooring, cabinetry that doesn’t touch plumbing or electrical — generally does not require a permit, but the line isn’t always obvious, and pulling the wrong assumption can lead to a stop-work order or a code violation discovered later during a sale.
The Building Permit Process, Step by Step
Step 1: Confirm Jurisdiction and Zoning
Before drafting plans, confirm which building department has authority over your parcel and check the underlying zoning to make sure your intended project — a second story, an accessory dwelling unit, a commercial buildout — is even allowed on that lot. Zoning and permitting are related but separate reviews, and a project can fail zoning even if it would otherwise meet building code.
Step 2: Prepare and Submit Plans
Applicants submit detailed construction plans and specifications demonstrating compliance with the Florida Building Code (currently the 7th Edition) along with any Broward-specific local amendments. The complexity of your project drives how detailed these documents need to be — a water heater swap needs far less than a new two-story addition. Most jurisdictions in Broward now accept submissions through an online ePermits portal, though some permit types still require an in-person visit.
Step 3: Plan Review
Once submitted, your application enters plan review, where staff check the drawings against building code, zoning, life-safety, and — for many projects — impact fee requirements. Review times vary widely: simple express reviews can complete in as little as 3 to 5 business days, while complex commercial or multi-trade projects can take 15 to 30 business days or more, depending on department workload and how many review cycles (comments and resubmittals) the plans go through.
Step 4: Pay Fees and Obtain the Permit
Permit fees in Broward County are generally calculated based on project valuation and permit type, with plan review fees typically running 50% to 65% of the building permit fee itself. For applicable projects, impact fees also have to be paid — and proof of that payment, along with final planning and zoning approval, is usually required before the permit is actually issued. Once fees are settled and plans are approved, the county or city issues the permit and construction can legally begin.
Step 5: Construction and Required Inspections
Work cannot start before the permit is issued — beginning construction ahead of approval is one of the most common (and costly) mistakes property owners and contractors make. As the project progresses, a series of inspections are required at defined stages: typically foundation, framing, rough-in electrical/plumbing/mechanical, and then a final inspection once everything is complete. Each inspection has to pass before work can proceed to the next phase or before the permit can be closed out.

Step 6: Certificate of Occupancy or Completion
Once final inspections pass, the building department issues a Certificate of Occupancy (for new structures or work affecting occupancy) or a Certificate of Completion (for renovations that don’t change occupancy status). This document is what legally allows the space to be used or occupied, and it’s also a key record that later verifies the work was done to code — something buyers, insurers, and lenders will look for.
Step 7: Permit Closeout and Property Record Update
A permit isn’t truly finished until it’s closed out in the system. This closeout is also what eventually feeds into the Broward County Property Appraiser’s record — added square footage, a new pool, or a converted garage should be reflected in your property’s assessed characteristics only after the permit is properly finaled. An open or never-closed permit can cause real problems down the line, since it shows up in title searches and can hold up a sale until it’s resolved.
Permit Stages at a Glance
| Stage | What Happens | Typical Owner Action |
| Jurisdiction check | Confirm county vs. city authority and zoning | Verify parcel location and allowed use |
| Plan submission | Detailed plans filed for review | Submit via ePermits or in person |
| Plan review | Staff check code, zoning, and fee compliance | Respond to review comments promptly |
| Permit issuance | Fees and impact fees paid, permit issued | Pay all required fees before starting work |
| Construction & inspections | Staged inspections at each phase | Schedule inspections and keep records on-site |
| Certificate of Occupancy/Completion | Final sign-off on the finished work | Obtain and retain the certificate |
| Permit closeout | Permit finalized, record updated | Confirm permit shows “closed,” not “open” |
Broward County Building Department Contact Information
For unincorporated Broward County (the Broward Municipal Services District), the Building Code Services Division operates out of the county’s Government Center West location. The division falls under the Department of Development Services and handles plan review, permit issuance, and inspections for projects outside city limits. If your project sits inside one of Broward’s incorporated cities, you’ll need to go through that city’s own building department instead — contact information for each is typically listed on the city’s official website, and the county’s ePermits OneStop portal in several municipalities allows both county and city-related approvals to be handled through a single online system.
Office hours for the county division are generally Monday through Friday during standard business hours, closed on county-observed holidays. Because Broward periodically updates its permitting systems and portals, it’s worth confirming current online availability before assuming a fully digital submission is possible for your specific permit type.
Owner-Builder Permits: What to Know
Florida law does allow property owners to act as their own contractor under certain conditions, commonly called an owner-builder permit. This route comes with real trade-offs. An owner-builder takes on direct responsibility for ensuring all work meets code and is performed safely and legally — meaning if something goes wrong, the liability generally sits with the homeowner rather than a licensed contractor. Certain types of work may still require licensed subcontractors regardless of owner-builder status, particularly specialty trades like electrical and plumbing. Because of the added responsibility and risk, owner-builder permits are best suited to straightforward projects rather than complex new construction, and it’s worth reviewing the specific statutory requirements before choosing this path over hiring a licensed general contractor.

Why New Construction Directly Affects Your Property Tax Record
New construction and major renovations don’t just change what your property looks like — they change what it’s worth on paper, and that flows straight into your tax assessment. When a permit for new square footage, a pool, or a significant structural addition is closed out, the Broward County Property Appraiser typically updates the property’s recorded characteristics to reflect the change, which can increase the assessed value and, in turn, the property tax bill starting the following tax year.
This is exactly why permit closeout matters so much. If a homeowner finishes construction but the permit is never properly closed, the county’s record can end up mismatched with reality in either direction — sometimes underreporting improvements (which eventually gets caught and can trigger a retroactive adjustment), and sometimes leaving an “open” permit flag on the property that scares off buyers or slows a sale, even if the work itself was done correctly.
Homestead exemptions add another layer worth understanding. Florida’s Save Our Homes cap limits how much your assessed value can increase year over year for exemption-eligible properties, but new construction is typically added to the assessed value on top of that cap in the year it’s completed — meaning a major addition can produce a real jump in your tax bill that the cap doesn’t fully protect you from.
Common Mistakes That Delay New Construction Projects
A handful of avoidable errors account for most of the delays property owners run into. Submitting to the wrong jurisdiction — county instead of city, or vice versa — is one of the most frequent. Starting work before the permit is actually issued is another, and it can result in stop-work orders, fines, or having to open walls back up for inspection. Skipping required inspections at each phase, rather than scheduling them as the work progresses, often forces costly rework later. And leaving a permit open after construction is complete — simply never scheduling that final inspection — is a mistake that frequently surfaces years later during a sale, when a title search flags it and stalls closing until it’s resolved.
Frequently Asked Questions
Does Broward County or my city issue my building permit? It depends on where your parcel is located. The Broward County Building Code Services Division issues permits for unincorporated areas, while each of Broward’s incorporated cities generally runs its own building department and permitting process.
How long does a Broward County building permit take to review? It ranges widely. Simple express reviews can be completed in as little as 3 to 5 business days, while complex or commercial projects can take 15 to 30 business days or longer, depending on how many review cycles are needed.
Do I need a permit for a water heater or AC replacement? Yes. Broward County requires permits for water heater installations, air conditioning units, and similar mechanical replacements, even though they’re often smaller in scope than a full renovation.
What happens if I start construction before my permit is issued? This can result in a stop-work order, fines, or being required to expose completed work (like opening a wall) for inspection after the fact. Permits must be issued before construction legally begins.
Will new construction increase my property taxes? Usually, yes. Once a permit for new square footage or a major improvement is closed out, the Broward County Property Appraiser typically updates the property’s assessed characteristics, which can raise your assessed value and tax bill in the following year.
What is an open permit, and why does it matter when selling a property? An open permit is one that was issued but never properly closed out with a final inspection. It’s flagged in county records and often surfaces during a title search, which can delay or complicate a sale until it’s resolved.
Do I need a licensed contractor to pull a building permit? For most construction and trade work, yes — permits are generally pulled by a licensed, qualifying contractor. Certain limited exceptions exist under Florida Statutes for owner-builders, but these come with their own restrictions and responsibilities.
Conclusion
New construction in Broward County runs through a defined path — confirm jurisdiction, submit and pass plan review, pay permit and impact fees, complete staged inspections, obtain a Certificate of Occupancy or Completion, and close the permit out properly. Skipping steps or rushing past inspections doesn’t just risk fines; it creates problems that resurface later, whether that’s a stalled sale due to an open permit or a tax assessment that doesn’t match the improvements you actually made.
Treating the permitting process as connected to your property record — rather than a separate hoop to jump through — is the smarter way to approach it. A permit that’s properly closed protects your investment, keeps your Broward County property record accurate, and avoids surprises the next time you sell, refinance, or simply review your tax bill.